al saghyir boilers pressure vessels factory

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

al saghyir boilers pressure vessels factory have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


al saghyir boilers pressure vessels factory.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
al saghyir boilers pressure vessels factory al saghyir boilers pressure vessels factory al saghyir boilers pressure vessels factory

Shareef Shareef - Operation & maint. Engineer - A

Join LinkedIn Summary. I have been working in Al saghyir boilers & pressure vessels factory as a boiler and pressure vessel manufacturing and commissioning and maintenance engineer for 8 years along with sales experience.Equipped with more than 15 years of experience performing as well as driving all aspects of inspections, welding, and fabrication with oil & gas and petrochemical platforms.

lexie@zozen.com > Get A Quote >

al-saghyir-boilers-pressure-vessels-factory Jobs - a

4269 al-saghyir-boilers-pressure-vessels-factory Jobs avaliable. Apply for latest al-saghyir-boilers-pressure-vessels-factory openings for freshers and experienced. All current al-saghyir-boilers-pressure-vessels-factory job postings listed from Gulf.

lexie@zozen.com > Get A Quote >

al saghyir steam boilers co ltd – Industrial Boile

2016-6-30 · Al-saghyir boilers & pressure vessels Factory Co. LTD. To connect with Al-saghyir boilers & pressure vessels Factory Co. LTD, sign up for Facebook today. AL SAGHYIR STEAM BOILERS FACTORY CO LTD. AL SAGHYIR STEAM BOILERS FACTORY CO LTD Heating & Cooling Airconditioning Equipment Central Riyadh .

lexie@zozen.com > Get A Quote >

Al Saghyir Boilers & Pressure Vessels Factory Co., Lt

Al Saghyir Boilers & Pressure Vessels Factory Co., Ltd - Process Equipment: Boilers

lexie@zozen.com > Get A Quote >

Alsaghyir Boilers & Pressure,Other Jewelry & Watche

Al-Saghyir Boilers & Pressure Vessels Factory (SB&P) was established in Riyadh's Second Industrial City in 1987. SB&P boasts a full line of products with the brand name `CAPITOL`. Their product range encompasses the following: steam and hot water boilers, central heaters, ancillary equipment, pressure vessels, LPG tanks, and storage tanks for

lexie@zozen.com > Get A Quote >

Pressure Vessels & Gauges in Saudi Arabia – KSA

Pressure Vessels & Gauges in Saudi Arabia - search for business listings, telephone numbers, ratings and complete information on Daleeli.com Pressure Meters, Pressure Vessels & Gauges. Al Saghyir Boilers & Pressure Vessels Factory . Misfah Dist., Riyadh . Category(s):

lexie@zozen.com > Get A Quote >

Al Saghyir Boilers & Pressure Vessels Factory Co. LT

Al Saghyir Boilers & Pressure Vessels Factory Co. LTD - Group of Al Saghyir May 5 at 3:35 PM · عائلة مصنع الصغير للمراجل و الأوعية المضغوطة تهنئكم بحلول شهر رمضان المبارك و أعاده الله عليكم باليمن و العافيه و كل عام و أنتم بخير.

lexie@zozen.com > Get A Quote >

Pressure Vessels & Gauges in Kuwait | Arab Loc

Pressure Vessels & Gauges Al Saghyir Boilers And Pressure Vessels Factory. 0 (0 out of 5) Al Saghyir Boilers And Pressure Vessels Factory. Misfah Dist., Riyadh, Misfah Dist., Riyadh, Riyadh Province, Saudi Arabia +966 112652888. 37. 0 (0 out of 5) Rate this Get directions

lexie@zozen.com > Get A Quote >

Karamullah Bhutto - Mechanical Design Enginee

Mechanical Design Engineer (Static Equipment) Al-Saghyir Boiler & Pressure Vessels Factory Co, LTD květen 2016 – do současnosti 3 roky 2 měsíce. Riyadh. Mechanical Design, Analysis, Rating and preparation of detailed construction drawings of Pressure vessels, Columns, Heat Exchangers, Surge Vessels, Air Receivers, Fuel Oil tanks, Blowdown tanks & LPG tanks for Oil refineries, oil & gas

lexie@zozen.com > Get A Quote >

ALSAGHYIR TRADING-CONTRACTING CO.L

Al Saghyir Boilers & Pressure Vessels Factory Ltd. (AB&P) is a significant strategic business unit and is one of the leading fabricators of Vessels, Tanks, Boilers, and LPG & SNG System for Oil, Gas, Petrochemicals and water.

lexie@zozen.com > Get A Quote >

Boilers Supplies & Parts Dubai,Steam Boilers Ho

2019-6-5 · These boilers are used for a variety of heating applications or processes such as central heating, sanitation, boiler based power generation, cooking and others. The boilers suppliers and parts meet the demands of different industries such as paper industry, power plants and others.

lexie@zozen.com > Get A Quote >