waste heat recovery boiler cement plant

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

waste heat recovery boiler cement plant have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


waste heat recovery boiler cement plant.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
waste heat recovery boiler cement plant waste heat recovery boiler cement plant waste heat recovery boiler cement plant

waste heat recovery boiler,cfb steam boiler,boiler i

2019-4-8 · Waste heat recovery unit for cement plant. During the production process, a lot of waste heat will be generated and so takes away part of heat energy. With a waste heat recovery unit, the waste heat could be collected and reused for heating or generating power. The cement kiln waste boiler is small size, low steel consumption and less air leakage.

lexie@zozen.com > Get A Quote >

waste heat recovery boiler,cfb steam boiler,boiler i

2019-4-8 · Waste heat recovery unit for cement plant. During the production process, a lot of waste heat will be generated and so takes away part of heat energy. With a waste heat recovery unit, the waste heat could be collected and reused for heating or generating power. The cement kiln waste boiler is small size, low steel consumption and less air leakage.

lexie@zozen.com > Get A Quote >

Trends in power generation from waste heat i

Summary: The generation of power from waste heat in cement plants was for a long time the subject of controversial discussion. ­Today, hardly anyone remains unconvinced by the concept. Depending on the system used, 30–45 kWh/t clinker can be generated, which is up to 30 % of the electrical power requirement of a cement plant. The benefits of this technology are clear.

lexie@zozen.com > Get A Quote >

Low Temperature Waste Heat Recovery for Powe

2019-4-26 · 35 ton waste heat recovery boiler for power plant in Kazakhstan. Low temperature waste heat recovery. Iron & steel industry, cement plant, chemical industry and some other industries continuously eject low or medium flue gas with the temperature less than 300~400℃. And our low temperature waste heat recovery boiler can just turn the low

lexie@zozen.com > Get A Quote >

Waste Heat Recovery Boilers ( WHRB )

2019-6-8 · In waste heat recovery boiler the exhaust gases are usually in the medium temperature range and in order to conserve space, a more compact boiler can be produced if the water tubes are finned in order to increase the effective heat transfer area on the gas side.

lexie@zozen.com > Get A Quote >

Waste heat recovery boilers (WHRB) | Danstok

Waste heat recovery boilers (WHRB) Design and development of special boilers and economizers for heat recovery of exhaust gases originating from chemical and industrial processes. The waste heat is recovered in single, double or triple-pass boilers provided with low-temperature economizers or integrated superheaters in the steam boilers.

lexie@zozen.com > Get A Quote >

waste heat recovery boiler,cfb steam boiler,boiler i

2019-4-8 · Waste heat recovery unit for cement plant. During the production process, a lot of waste heat will be generated and so takes away part of heat energy. With a waste heat recovery unit, the waste heat could be collected and reused for heating or generating power. The cement kiln waste boiler is small size, low steel consumption and less air leakage.

lexie@zozen.com > Get A Quote >

Waste Heat Recovery Studies / Cogeneration Plant

Waste Heat Recovery Systems (WHR) utilize the heat in industrial waste gases for the generation of electrical power. WHR Systems are common in cement and lime plants and other pyroprocess industries where Rotary Kilns are used and the price and reliability of grid power supply make the investment economically feasible.

lexie@zozen.com > Get A Quote >

Waste Heat Recovery Boilers - thyssenkrup

Waste Heat Recovery Boilers System Description. The WHR boilers supplied by thyssenkrupp Industries India is a natural circulation boiler well proven in many plants and under difficult conditions. They distinguish themselves by a robust and clear design best fitted for the demands of power stations or industrial applications.

lexie@zozen.com > Get A Quote >

Design of cement plant waste heat recover

Abstract: Waste heat in cement plant is a huge waste heat from kiln and raw mill plant. Such as ordinary power plant, waste heat recovery generation consist of various operation units ie., economizer, evaporator, super heater, steam drum, and turbine.

lexie@zozen.com > Get A Quote >

Waste Heat Recovery Systems For Cement/Steel/Glas

Turnkey Waste Heat driven Power Plants TESPL is the leading EPC company in India experienced in providing customized and tailor made systems such as Waste Heat Recovery Systems for Cement Plants, Waste Heat Recovery Systems for Steel and Glass Plants and Waste Heat Recovery Systems on Engines for improving energy reutilization and for reducing overall energy cost of process plant.

lexie@zozen.com > Get A Quote >