2 5ton four pass boiler vietnam in building materials industry

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

2 5ton four pass boiler vietnam in building materials industry have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


2 5ton four pass boiler vietnam in building materials industry.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
2 5ton four pass boiler vietnam in building materials industry 2 5ton four pass boiler vietnam in building materials industry 2 5ton four pass boiler vietnam in building materials industry

Enginnering Resume - DocShare.ti

STEP FOUR: Handling the Interview and Negotiating Salary Now you're ready for Step Four: actually handling the interview successfully and effectively. Remember, the purpose of an interview is to get a job offer. Eight "do's" for the interview A smile at an interview makes the employer perceive of

lexie@zozen.com > Get A Quote >

buy Heat Pumps - high qualit

Vietnam Credibility: Commercial Units For Factory,hospital,Sauna and swimming pool,Hotel, restaurant,home etc.Feagures&Materials:The use of flexible, easy to install central heating. EnPlus offers a complete line of high efficiency horizontal and vertical units from 2.8 to 17.7 kW. Four cabinet sizes with a similar shape allow for

lexie@zozen.com > Get A Quote >

2 set 20ton four pass boiler in pharmaceutical facto

201884 - 2 set 20ton aac plant in building materials industry 2 sets 20ton double boiler Korea applied in school; 7 ton aac plant in China Equipment For Cutting (6) Supplier Country China (250) Korea (4) India (3) Lebanon (3) Lithuania (2) Hong Kong (2) More 12 bars four-pass boiler

lexie@zozen.com > Get A Quote >

industrial boiler 2 ton steam c class Industrial 2 to

2 5ton four pass boiler vietnam in building materials . 2ton an hour bomass boiler – Industrial Boiler Supplier Capacity: 1 ton,2 ton,3 ton,4 ton,5 ton,6 ton,7 ton,8 ton,9 ton,10 ton,15 ton,20 We also supply 12 ton biomass fired fired, 12 ton coal fired boiler, and other Post navigation Contact : : In Malaysia Pressure 7- 8 kgs 12 Ton Gas Steam Boiler Three Pass Fire Tube.

lexie@zozen.com > Get A Quote >

wastewater evaporation ponds: Topics by Science.g

Environmental Projects. Volume 8: Modifications of wastewater evaporation ponds. NASA Technical Reports Server (NTRS) 1989-01-01. The Goldstone Deep Space Communications Complex (GDSCC), located in the Mojave Desert about 45 miles north of Barstow, California, and about 160 miles northeast of Pasadena, is part of NASA's Deep Space Network, one of the world's largest and most sensitive

lexie@zozen.com > Get A Quote >

ufdc.ufl.e

2010-11-13 · use sustainable building practices through financial incentives, and reaffirmed the county commitment to building "green." Private contractors who build to "green" standards will enjoy fast-track permitting for building permits and a 50 percent reduction in the cost of building permit fees up to a maximum of $1,000.

lexie@zozen.com > Get A Quote >

10 ton boiler – Sell Steam Boiler-Sitong Boil

Following a boiler explosion, the four-story wooden building collapsed and the ruins burst into flames, incinerating workers trapped in the wreckage.Hamada Boiler: Rice Husk Firing Boiler2010-7-9 · This is the rice husk consumption record and exhoust flue gas emission test. Rice husk consumption average : 240 Kg/ton Steam.

lexie@zozen.com > Get A Quote >

the 2016 Roll Models Catalog NOW! - video player

the 2016 Roll Models Catalog NOW! $8.00 2016 Catalog Spring 2016 Fax [email protected] Dear Customer: Catalog 2016 Prices: We thank you for your interest in Roll Models and for ordering our catalog. We want you to know that we strive to bring you the best service possible, as well as low discount prices on a wide range of model kits, books, paints and accessory items.

lexie@zozen.com > Get A Quote >

Heating and Air Conditioning | Trane Commercial HV

A Trane Commercial HVAC system always means quality and reliability. Trane products and systems offer a variety of heating, ventilation, and air conditioning solutions for your HVAC needs.

lexie@zozen.com > Get A Quote >

All Products - ULI

Uline stocks over 36,000 shipping boxes, packing materials, warehouse supplies, material handling and more. Same day shipping for cardboard boxes, plastic bags, janitorial, retail and shipping supplies.

lexie@zozen.com > Get A Quote >

Roll Models 2015 Catalog [PDF] - Free Online Publishi

Transcript. 1 $8.00 2015 Catalog Spring 2015 Fax [email protected]. 2 Dear Customer: Catalog 2015 Prices: $8.00 We thank you for your interest in Roll Models and for ordering our catalog. Visa, MasterCard, American Express and Discover (Novus) are accepted. We want you to know that we strive to bring you the best service possible, as well as low discount prices on a wide

lexie@zozen.com > Get A Quote >