9214 full automatic biomass pellet boiler

Industrial boilers

Product thermal capacity: 4-35 t/h

Working pressure: 1.0-2.5 MPA

Outlet temperature: 184-350 ℃

Available fuel: natural gas, coke oven gas, bio-gas,liquid propane gas, diesel, heavy oil, light oil, crude oil

Available industries: Petroleum, chemical, chemical fiber, pharmaceutical, textile printing and dyeing, building materials, wood processing, vegetable oil processing and other industries

  • Product introduction
  • Technical advantages
Introduction

9214 full automatic biomass pellet boiler have a three-pass round coil structure. A conical coil is used for the effective protection of the furnace wall at the boiler end. This product is equipped with an advanced combustion device and is fully automated in operation. After the burner ignites the fuel, flame fills the round coil tubes and transfers heat by radiation through the tube wall (first pass). The high temperature flue gas gathers at the back door and then turns to the convection tubes section (second pass), where heat transfer takes place by convection. The flue gas gradually cools down here and flows to the front door, where it is reversed and goes into the third pass. After that, it enters into the chimney through the economizer and is released into the atmosphere.


9214 full automatic biomass pellet boiler.This type of heater is delivered as a whole, and is installed on site, it only needs to connect thermal gas(oil) piping and electricity to start operation. The heater has four heating areas: furnace radiation heating area, the first convection tube bundle heating area, the second convection tube bundle heating area and economizer (waste heat boiler).

Digitized manufacture
  • The laying-off of steel tube adopts CNC 3D laser cutting machine.
  • The manufacture of round coil tube adopts CNC coil tube automatic production line. Once-forming and no need for plastic .
Full argon arc welding
  • The tube butt adopts argon arc welding technique and the seams will be done x ray real-time imaging, preventing unqualified seams from entering coil production line .
Easy operation
  • Heater is wholly assembled before delivery, it is easy for installation, debugging and operating.
  • Fully automatic operating, burning, liquid level of high level tank, outlet temperature and flow rate are adjusted automatically and self-protected.
  • The inlet and outlet with end flanges and flanged cover structure facilitate the installation and layout of tubeline in boiler house.
Less fuel consumption
  • Internal side adopts good insulation material, outside uses stainless steel plate, which can mostly reduce heat lost and make working environment better.
  • Multilayers closely spaced tube bundle and steel rod is used to seal and fix, completely eradicating short circuit of flue gas.
  • Before delivery, the residue moisture is removed completely, so the system draining period is reduced to 2 days from 12 days.
Safely operation
  • The inner coil tube has bigger flow rate, so it is more stable under high temperature operation.
  • Conical coil effectively protects the furnace wall at the end of heater and burner on the top.
9214 full automatic biomass pellet boiler 9214 full automatic biomass pellet boiler 9214 full automatic biomass pellet boiler

BiomassGasificationCountryReportsOct2004 - [PD

IEA Bioenergy task 33 GasiIication & EU Gasnet - 1 - COUNTRY REPORT Status oI Biomass GasiIication in countries participating in the IEA Bioenergy Task 33 Biomass GasiIication

lexie@zozen.com > Get A Quote >

pilot plant activities: Topics by Science.g

2018-5-30 · The pilot plant for electron beam food processing. NASA Astrophysics Data System (ADS) Migdal, W.; Walis, L.; Chmielewski, A. G. 1993-07-01. In the frames of the national programme on the application of irradiation for food preservation and hygienization an experimental plant for electron beam processing has been established in INCT. The pilot plant has been constructed inside an old fort what

lexie@zozen.com > Get A Quote >

Full text of "Monthly catalog of United State

Full text of "Monthly catalog of United States Government publications" See other formats

lexie@zozen.com > Get A Quote >

BiomassGasificationCountryReportsOct2004 - [PD

IEA Bioenergy task 33 GasiIication & EU Gasnet - 1 - COUNTRY REPORT Status oI Biomass GasiIication in countries participating in the IEA Bioenergy Task 33 Biomass GasiIication

lexie@zozen.com > Get A Quote >

BiomassGasificationCountryReportsOct2004 - [PD

IEA Bioenergy task 33 GasiIication & EU Gasnet - 1 - COUNTRY REPORT Status oI Biomass GasiIication in countries participating in the IEA Bioenergy Task 33 Biomass GasiIication

lexie@zozen.com > Get A Quote >

recovery ior projects: Topics by Science.g

Report: EPA Needs to Better Document Project Delays for Recovery Act Diesel Emission Reduction Act Grants. EPA Pesticide Factsheets. Report #11-R-0179, March 28, 2011. While DERA project officers were aware of Recovery Act grant project delays, they did not always document delays in EPA's grants management system or, in some cases, take action to reduce the impact of project delays.

lexie@zozen.com > Get A Quote >

Full text of "Federal register [microform]" - Interne

Search the history of over 366 billion web pages on the Internet.

lexie@zozen.com > Get A Quote >

2008-8-28 · [202975] mfqZQDeBUqyGvh :maximum safe single dose of xanax :2008/08/29(Fri) 04:29 <HOME> Good site! Good resources here, I will bookmar

2008-8-28 · [202975] mfqZQDeBUqyGvh :maximum safe single dose of xanax :2008/08/29(Fri) 04:29 <HOME> Good site! Good resources here, I will bookmark

lexie@zozen.com > Get A Quote >

Automatic Boilers, Automatic Boilers Suppliers an

Alibaba.com offers 25,349 automatic boilers products. About 41% of these are boilers, 3% are electric kettles, and 1% are industrial furnace. A wide variety of automatic boilers options are available to you, such as once through, natural circulation, and water dispenser parts.

lexie@zozen.com > Get A Quote >

Full text of "Federal register [microform]" - Interne

Search the history of over 366 billion web pages on the Internet.

lexie@zozen.com > Get A Quote >

recovery ior projects: Topics by Science.g

Report: EPA Needs to Better Document Project Delays for Recovery Act Diesel Emission Reduction Act Grants. EPA Pesticide Factsheets. Report #11-R-0179, March 28, 2011. While DERA project officers were aware of Recovery Act grant project delays, they did not always document delays in EPA's grants management system or, in some cases, take action to reduce the impact of project delays.

lexie@zozen.com > Get A Quote >